> Town of Whitby | Metrolinx Engage

Town of Whitby

This page contains information on the preliminary design in the Town of Whitby.

Live Meetings

View the Live Meetings page to register for upcoming meetings for the Town of Whitby and watch recordings of past meetings.

Learn more →

The preliminary design can also be viewed on the project’s interactive map.


A map indicating the five different corridor design segments for the Town of Whitby portion of the BRT project. Segment 1 is from Lake Ridge Road to Cochrane Street; the design proposes to widen the segment to add two dedicated centre-median transit lanes and maintain existing four lanes for general traffic. Segment 2 is from Cochrane Street to Byron Street; the design proposes to convert two general traffic lanes to dedicated centre-median transit lanes and maintain one general traffic lane in each direction. Segment 3 is from Byron Street to Green Street; the design proposes a transit mall, with general traffic restricted between Byron and Green/Perry Streets. The design includes wider sidewalks and business service areas. Segment 4 is from Green Street to Garden street; the design proposes to convert two general traffic lanes to dedicated centre-median transit lanes and maintain one general traffic lane in each direction. Segment 5 is from Garden Street to west of Thornton; the design proposes to widen the segment to add two dedicated centre-median transit lanes and maintain existing four lanes for general traffic. A table explaining the lane modifications for each road segment in the Town of Whitby. Segment 1: Existing Lanes, 4. Future proposed traffic lanes, 4. Total number of lanes including BRT lanes, 6. Segment 2: Existing Lanes, 4. Future proposed traffic lanes, 2. Total number of lanes including BRT lanes, 4. Segment 3: Existing Lanes, 4. Future proposed traffic lanes, 0. Total number of lanes including BRT lanes, 2. Segment 4: Existing Lanes, 4. Future proposed traffic lanes, 2. Total number of lanes including BRT lanes, 4. Segment 5: Existing Lanes, 4. Future proposed traffic lanes, 4. Total number of lanes including BRT lanes, 6.

Preliminary Renderings for Town of Whitby

Renderings have been developed to show how the corridor would look in the future with BRT.

Rendering of Dundas Street at Annes Street / Cochrane Street, looking east

Rendering of Dundas Street west of Annes Street / Cochrane Street, looking east

Rendering of Dundas Street east of Byron Street, looking east

Let us know your thoughts on the preliminary design for the Town of Whitby by filling out the online survey below. The survey will remain open until Thursday, November 11, 2021.

Provide Your Feedback