Kitchener Corridor - Heritage Road Layover - Draft Environmental Project Report

8 avr, 2022

Learn about the study findings along with key mitigation and monitoring measures that will be implemented for the project.

The draft Environmental Project Report (EPR) has been completed for the Heritage Road Layover TPAP, in accordance with Ontario Regulation 231/08. The environmental impact of the Heritage Road Layover was assessed, and a draft Environmental Project Report (EPR) was prepared in accordance with the Transit Project Assessment Process (TPAP) as prescribed in Ontario Regulation 231/08 - Transit Projects and Metrolinx Undertakings (made under the Environmental Assessment Act).

Review the full Public Information Center #2 presentation document to learn more about the proposed Heritage Road Layover project.