> The Hurontario Light Rail Transit Project (Round 2) | Metrolinx Engage

The Hurontario Light Rail Transit Project

The Hurontario Light Rail Transit Project (Round 2)

Now under construction, this exciting transit project is bringing 18 kilometers of smooth, fast, reliable rapid transit to Mississauga and Brampton along the Hurontario corridor. The project will mean a doubling of the corridor’s capacity to move people while reducing congestion. The Hurontario Light Rail Transit (LRT) project will operate on a dedicated lane, avoiding traffic disruptions, significantly improving transit time. The project is an integral part of the regional transportation network and will provide residents and businesses in Peel with clean, electrically powered, convenient and integrated transit.

We are doing our part to protect staff and the public during COVID-19. During this time, our engagement has moved to a virtual format.

Our team continues to support our residents and business within the community, visit the contact us page to learn more.

 

Key Features of the Hurontario LRT

  •  19 stops
  •  18 kilometers
  •  In service 2024
  •  Operates in a dedicated lane

Station and Stops

  •  1 below-grade stop
  •  18 at-grade stops
  •  Connections to Port Credit Go, Cooksville Go and Mississauga Transitway
  •  Connections to MiWay, MiWay express, Brampton transit and Züm routes

 

Decorative image displaying hands and leaves
Construction crew removing medians along Hurontario Street.
construction crews investigate materials under the roadway using a borehole drilling machine.
Woman using a video conference tool to engage virtually.