Scarborough Subway Extension LIVE - May 31, 2021

Join the Scarborough Subway Extension team LIVE to have your questions answered. 

Please join us on May 31, 2021 at 6:30PM where our project team will present up to date information and answer your questions about construction and the status of the project. The panel will include experts from project delivery team. 

Metrolinx will provide a brief presentation followed by a question-and-answer session. Our virtual platform will allow you to vote on the questions you’d most like answered, and the order our experts take them in will be based on popularity (total votes). We encourage you to submit and vote on questions now. You may also submit questions during the meeting. 

 

Agenda

6:30: Meeting Begins/ Opening Remarks

6:35: SSE Project Update Presentation

6:40: Questions and Answers

7:25: Wrap up & Closing Remarks

Meet the Speakers

Photo of Arad Mohagheg

Arad Mohaghegh

Senior Project Manager, Scarborough Subway Extension

Photo of Michael Hodge

Michael Hodge

Program Sponsor, Scarborough Subway Extension Project

Photo of Georgina Collymore

Georgina Collymore

Manager, Community Engagement, Scarborough Subway Extension

Other Participants

  • Jenny Mathura, Sponsor, Scarborough Subway Extension

Format & Accessibility

Questions will be answered based on popularity (total votes). We aim to answer all questions.

Please review and note that conduct inconsistent with our policies will result in removal.

To enable closed captioning, toggle captions “on” in the YouTube video player settings.

Comment Sort

Comments

Anonymous's avatar
Jun 22, 2021 - 16:31

With the Scarborough Centre station being located along McCowan, will there be a new pathway to the Scarborough Towne Centre.

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 12, 2021 - 21:06

The new station for Scarborough Centre is directly south of the shopping centre, 500m east of the existing station presenting some challenges for a bridge connection. The city is undergoing a separate study of the area that will review pedestrian connections to and from the station.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Jun 22, 2021 - 16:32

With Line 2 being extended into Scarborough, will Line 2 be receiving new trains for this extension.

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 12, 2021 - 21:04

As a part of the Line 2 subway extension into Scarborough, new trains will be purchased to enhance the existing fleet. Collaborations between Metrolinx, TTC and the province of Ontario will be ongoing to provide municipalities with services that meet their expectations.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar
Jun 22, 2021 - 16:35

Will the station at Sheppard Avenue have provision for a future LRT connection running east from the station?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 12, 2021 - 21:08

Within all expansion plans, Metrolinx aims to ensure new transit being built has options for future connectivity.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar
Jun 22, 2021 - 16:36

Will there be Platform Screen Doors on the SSE

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 14, 2021 - 10:41

We’re designing stations along the Scarborough and Yonge North subway extensions so that platform edge doors can be installed in the future.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar
Jun 22, 2021 - 16:36

Can you please give an overview of the transit solutions being considered between when the SRT shuts down and the SSE opens (especially for getting downtown)?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 12, 2021 - 21:11

Metrolinx supports municipalities with transit and will continue to assist the TTC as they’ve decided to shut down the SRT in 2023. The TTC is currently evaluating their options and they plan to present some recommendations to their board in 2022.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar
Jun 22, 2021 - 16:36

How long will it take for the station at McCowan and Sheppard to be completed?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 12, 2021 - 21:14

Our targeted service date for the Scarborough subway extension to be completed is between 2029 and 2030.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Jun 22, 2021 - 16:38

The contracted company boring the tunnels shows a rough-in for five stations. Is there plans for the other two sites in the near future and if so, where?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 12, 2021 - 23:07

The Scarborough Subway Extension currently has 3 new stations being built as a part of the expansion. Within the design and plan for expansion, Metrolinx aims to ensure new transit being built has options for future connectivity. At the moment plans for additional stations have not been confirmed or funded by Metrolinx.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Will there be provisions made to allow for a future station close to Brimley and Eglinton?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 12, 2021 - 23:09

Within the design and plan for expansion, Metrolinx aims to ensure new transit being built has options for future connectivity. There isn't currently a plan for a subway station at Brimley and Eglinton.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Jun 22, 2021 - 16:39

Should the Scarborough residents along McCowan road corridor worried about this tunnel boring noise, dust, drilling damages to their properties and health?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 13, 2021 - 00:34

We're committed to minimizing and managing all issues including noise, vibration and dust. Metrolinx will communicate directly with residents who will need modifications to their property to accommodate the construction of the subway extension.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar
Jun 22, 2021 - 16:41

What are the plans from the Don Mills stop to the Sheppard East Extension?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 13, 2021 - 00:40

Within the design and plan for expansion, Metrolinx aims to ensure new transit being built has options for future connectivity. Funding has not been confirmed for the subway extension from Don Mills to Sheppard station at the moment.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar
Jun 22, 2021 - 16:41

Scarborough Extension should go up to Malvern Town Centre Mall for people to get to work early instead of waiting for 131, 133, 134 routes

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 13, 2021 - 10:29

Thank you for your feedback. The current funding for the Scarborough Extension will not expand subway services to Malvern Town Centre. Within the design, Metrolinx aims to ensure new transit being built has options for future connectivity.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar
Jun 22, 2021 - 16:42

What are the health costs to residents with windows and balcony doors facing Sheppard in the one residential building facing any side of the construction site?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 13, 2021 - 10:31

We have a number of different measures we can put in place to reduce and manage any impacts to our communities including specific limits for construction noise at different times of the day, using water tankers to reduce dust and using construction equipment and methods that minimize noise and vibration.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Jun 22, 2021 - 16:42

Which houses will be expropriated on McCowan and Lawrence to build the station?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 13, 2021 - 09:26

Homeowners that reside within identified Transit Corridor Lands will be contacted directly by Metrolinx to discuss expropriation if it's necessary. Each case is considered independently, and every effort is made to reach amicable agreements and compensate property owners with fair market value. 

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar
Jun 22, 2021 - 16:43

Will the extension be accessible to those living in Kennedy Commons?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 13, 2021 - 15:35

Residents living near Kennedy Commons will have a short commute to either McCowan and Sheppard or McCowan and Progress. These locations will be the closet subway stations being built as part of the line 2 extension.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Jun 22, 2021 - 16:44

Do we have a rough idea of the cost to connect either Line 4 or create a sheppard east LRT between Don Mills Station to McCowan or Malvern.

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 13, 2021 - 15:41

It's hard to estimate the actual cost to create an extension that connects line 4. For the Scarborough Subway Extension, the anticipated capital cost is approximately $5.5 billion.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Jun 22, 2021 - 16:44

Where will the new bus terminals be located at the Scarborough Centre Station and the Lawrence Station.

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 13, 2021 - 15:51

Lawrence subway station will be underground located at Lawrence Avenue, west of McCowan Road. Scarborough Centre subway station will also be underground, located east of McCowan Road and north of Bushby Drive. Sheppard station is an underground terminus station located directly east of McCowan Road and north of Sheppard Avenue.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar
Jun 22, 2021 - 16:45

Will the Existing bus terminal at the Scarborough Towne Centre be only for regional bus services.

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 13, 2021 - 15:55

GO Bus and intercity buses must relocate from the existing terminal in Fall 2022. TTC requires the extra space to run additional bus service to accommodate the decommissioning of Line 3 Scarborough, scheduled for 2023. A temporary location for GO Transit is proposed to be in operation between Fall 2022 and 2030.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Jun 22, 2021 - 16:45

When will construction begins and how long will this project takes?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 13, 2021 - 16:05

Metrolinx officially broke ground on the three-stop Scarborough Subway Extension on June 23rd, 2021. The targeted service date for the completion of this project is estimated to be between 2029 and 2030.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar
Jun 22, 2021 - 16:46

According to the EPR addendum, PPUDO for McCowan/Shep is at the north end of the station. Will there be pedestrian access to the station from the east/Sheppard?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 13, 2021 - 17:01

The new station for Scarborough Centre is directly south of the shopping centre, 500m east of the existing station presenting some challenges for a bridge connection. The city is undergoing a separate study of the area that will review pedestrian connections to and from the station.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar
Jun 22, 2021 - 16:47

When will construction start in the Lawrence McCowan intersection? Will this affect the hospital? Will there be night time construction?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 13, 2021 - 17:17

Metrolinx will provide updates in advance of any construction to keep residents in the community informed. Conversations are ongoing with the hospital to minimize property impacts and create efficiencies and cost savings. Minor construction activities may be scheduled during off-peak, weekend or overnight hours.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar
Jun 22, 2021 - 16:48

Will Scarborough extension going to cause any impact on any business and commuters on Eglington, Danforth and McCowan Rd?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 13, 2021 - 17:31

Businesses within the community may be impacted to complete the line 2 expansion. Metrolinx works with owners and tenants to see how they may be able to continue operating. If operations are impacted, compensation and supports may be provided. Each case is considered independently to ensure the right solutions are in place for each business.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar
Jun 22, 2021 - 16:49

How will Metrolinx compensate for any personal or property damages caused by this Scarborough line extension?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 13, 2021 - 17:24

The preferred approach is always to discuss each situation on a case by case basis, directly with owners to reach an amicable solution that resolves the concern to their satisfaction.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar
Jun 22, 2021 - 16:50

What are the chances of this construction causing multiple communication or electrical outage for the residents along Eglington, Danforth and McCowan Rd?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 13, 2021 - 00:29

Before we start any construction, we must consider the infrastructure that is already in the area. Metrolinx is working closely with utility companies to reduce community impacts and to complete any preparatory works in advance of the tunnel contract award.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar
Jun 22, 2021 - 16:50

What are the obstacle Danforth-McCowan property owners going to face during this construction? Will the fence or trees in my property get removed?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 13, 2021 - 00:26

We're committed to minimizing and managing all issues including noise and vibration. Metrolinx will communicate directly with residents who will need modifications to their property to accommodate the construction of the subway extension.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar
Jun 22, 2021 - 16:52

Will Metrolinx contractors vehicles or construction equipment be parked in properties along danforth-McCowan?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 13, 2021 - 18:12

We do not anticipate disruption to the properties along Danforth and McCowan with parked equipment or vehicles. Throughout the construction, Metrolinx will continue to work with the community to address any concerns related to the project. 

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar
Jun 22, 2021 - 16:53

Will there be protected structure for Sheppard Subway Extension near/under Sheppard station?

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Jun 22, 2021 - 16:53

I was trying to get some information about the survey,unable to get hold. Do we have a delicate person to response any questions or concerns in the future.

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 12, 2021 - 23:41

For any questions or concerns related to the Scarborough Subway Extension, please send us an email at [email protected]

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Jun 22, 2021 - 16:54

Why the station structure is not build while the tunnel boring machine is working?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 12, 2021 - 23:37

To drive efficiencies and maintain the timelines of the project, the decision was made to split the development of the extension into two contracts. One contract is for the tunnelling and the other is for the stations, rails and systems (SRS). The SRS construction will commence in 2023.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar
Jun 22, 2021 - 16:54

Where can I find the architecture plan drawings of the three stations?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 14, 2021 - 10:43

Station locations and footprints can be found on our website as part of the EPR addendum that was released last year.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Jun 22, 2021 - 16:55

How many parking and drop-off will be build for each station?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Nov 3, 2021 - 14:29

Our current plans for stations on the Scarborough Subway Extension do not include parking lots or garages but we are designing stations to maximize connectivity and convenience. Final designs for the stations, including passenger pick up and drop off locations, will be developed through the procurement process that started in September 2021. As these designs are finalized, we will share them with the community.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar
Jun 22, 2021 - 16:55

Will Kennedy station need to be closed in any time of construction?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 14, 2021 - 17:46

There will be intermittent impacts but the intent is to mitigate these as much as possible to maintain some level of operation at Kennedy station during construction. Where closures cannot be avoided, the TTC is involved in the process to determine the preferred closure options and mitigations.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Jun 22, 2021 - 16:55

Will there be space reversed for line 5 coming out east of Kennedy?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 12, 2021 - 23:29

Within the design and plan for expansion, Metrolinx aims to ensure new transit being built has options for future connectivity.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Jun 22, 2021 - 16:56

Are there any development above the station building?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 12, 2021 - 23:26

Metrolinx has implemented a program called "Transit Oriented Communities". Partnerships are developed with local entities to build new infrastructure along with the stations. Residents will continue to be informed with new developments happening in their community.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Jun 22, 2021 - 16:57

How deep are each of the stations? How long will it take to get to the platform level from the entrances? How far along is the subway station design, 0%? 30%?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 13, 2021 - 17:46

The tunnel boring machines (TBMs) will operate up to 35 metres underground. The stations, rails and systems contract is currently in the procurement phase and we anticipate this construction to start in the spring of 2023. Plannnig for our subway station designs are still in progress.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Jun 22, 2021 - 16:58

Is Metrolinx planning for at-grade or underground bus terminal at each station? What is Metrolinx planning to do with the space above the proposed bus terminal?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 13, 2021 - 17:51

Bus connection points at each station will be at grade. Through Metrolinx's transit oriented community program, partnerships are developed with local entities to build new infrastructure along with the stations. Residents will continue to be informed with new developments happening in their community.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Jun 22, 2021 - 16:59

When is construction beginning for the scarborough town centre area ?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 13, 2021 - 17:52

Metrolinx will provide updates in advance of any construction to keep residents in the community informed.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Jun 22, 2021 - 16:59

Hi, will the tunnel go underneath homes on its route?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 14, 2021 - 14:26

Our current assessments confirm that the tunnel will travel under building structures and some private properties. No plans have been confirmed for tunneling directly under residential home structures. We will continue to provide the community with updates regarding any changes to the subway extension.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Jun 22, 2021 - 17:00

couple of months ago I received a letter advising that I should be aware that the subway construction may cause issues at my address (1 block from McCowan).

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 12, 2021 - 22:37

Those letters are a part of our community engagement plans to keep residents who may potentially be affected informed. Our goal is to keep members of the community involved throughout the construction process.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Jun 22, 2021 - 17:01

Will existing bus lines enter a station or stop on the street? Example, Sheppard Ave E, Ellesmere, Lawrence Ave E

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 12, 2021 - 22:46

The TTC will be assessing their routes to make modifications that enhance the rider experience, based on the opportunities provided by the Scarborough Subway Extension.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Jun 22, 2021 - 17:01

As I live near McCowan and Sheppard, the construction is moving relatively fast. Is it possible for the construction to complete earlier?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 12, 2021 - 22:33

Metrolinx aims for continuous improvement to identify opportunities that can enhance our construction projects. While we constantly try to find efficiencies, the estimated completion date for the Scarborough Subway Extension is between 2029 and 2030. 

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar
Jun 22, 2021 - 17:02

What is the expected duration of construction? And how many construction jobs will be created over the course of the project's lifecycle? trades and admin jobs?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 12, 2021 - 22:26

The targeted service date for the Scarborough Subway Extension is between 2029 and 2030. 38,000 more people will be within walking distance to transit and more than 34,000 jobs will be accessible in 10-minute walk from a new Scarborough Subway Extension station.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar
Jun 22, 2021 - 17:02

Are there any plans to leave room for infill stations in the future, such as a station at Danforth and Eglinton?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 12, 2021 - 22:20

At the moment there isn't a plan for a station at Danforth and Eglinton. Within the design and plan for expansion, Metrolinx aims to ensure new transit being built has options for future connectivity.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar
Jun 22, 2021 - 17:03

Will Strabag and its subcontractors have government support to hire apprentices to help address upcoming trades shortages? is this CBs or something else?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 12, 2021 - 22:18

Metrolinx will collaborate with the companies awarded these construction projects, to introduce a community benefits program that offers opportunities for local workers and businesses.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Jun 22, 2021 - 17:04

When exactly the construction of the new line will begin? What is the closest estimate?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 12, 2021 - 22:13

Metrolinx officially broke ground on the three-stop Scarborough Subway Extension on June 23rd, 2021. 

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Jun 22, 2021 - 17:05

You forgot to mention that passengers who are travelling to/from York Region will have connections to YRT services at Sheppard Station

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 12, 2021 - 21:51

Thank you for your feedback. As a part of the Scarborough subway extension, there will be options for commuters to transfer between transit providers within the region.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Jun 22, 2021 - 17:06

TransitNow-speeditup Construction2slow What if anything U do 2 open 2022-we need 1stWorldSpeed not Tortise

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 12, 2021 - 21:45

Thank you for your feedback. Metrolinx aims to build transit that connects municipalities as efficiently as possible.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar
Jun 22, 2021 - 17:06

What's going to be the name of the station at McCowan & Lawrence?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 12, 2021 - 21:42

The names of the 3 stations being built for the Scarborough subway extension are Sheppard, Scarborough Centre and Lawrence. 

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar
Jun 22, 2021 - 17:07

What input did people living across the street from strabag construction at sheppard ave give? Can't open our windows for fresh air.

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 14, 2021 - 10:48

Being a good neighbour in the communities we serve is important to us. We have a number of different measures we can put in place to reduce and manage any impacts to our communities. Please feel free to contact us at [email protected] or 416-202-7900 with any feedback to address your concerns.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar
Jun 22, 2021 - 17:07

What are the expected impact to Highland Creek where SSE crosses? Any mitigation measures?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 12, 2021 - 21:36

Experts will be consulted to assist with potential challenges related to buildings, utilities, overflowing traffic, essential services and the natural elements of the earth. Insights from past projects has heightened Strabag's awareness to ensure a comprehensive monitoring program is developed and operated throughout the tunneling.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar
Jun 22, 2021 - 17:09

Where exactly is the Scarborough Center station to be located

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 12, 2021 - 21:32

The new station for Scarborough Centre is directly south of the shopping centre, 500m east of the existing station.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Jun 22, 2021 - 17:09

Will the launch site at Sheppard have construction activity 24 hours 7 days?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 12, 2021 - 22:11

Our launch site at McCowan and Sheppard will not have active construction above ground 24 hours, 7 days a week. The tunnel boring machine (TBM) will operate up to 35 metres underground, 24 hours a day, seven days week, and travel approximately 10 metres per day.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Jun 22, 2021 - 17:10

Will there be twin-tunnels or just one large tunnel with both eastbound and westbound tracks?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 12, 2021 - 21:56

The Scarborough Subway Extension will be a single tunnel with both eastbound and westbound tracks.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar
Jun 22, 2021 - 17:10

Will the surface route on McCowan be impacted and for how long?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 13, 2021 - 00:12

There will be impacts to the road network to include temporary lane restrictions and partial closure of intersections to prepare for long-term construction operations. Where possible, minor construction activities may be scheduled during off-peak, weekend or overnight hours to minimize disruptions to traffic.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar
Jun 22, 2021 - 17:11

STC bus terminal exists-KISS=connect up-and-aid connection future Sheppard Subway Extension from DM to STC

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 12, 2021 - 21:28

Within the design and plan for expansion, Metrolinx aims to ensure new transit being built has options for future connectivity.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Jun 22, 2021 - 17:11

When is the RT being closed ?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 12, 2021 - 21:23

The SRT will be shut down in 2023. The TTC is currently evaluating their options and they plan to present some recommendations to their board in 2022. We’re committed to staying updated as the TTC’s plans develop, to ensure we can have the necessary resources and provide the same level of service.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Jun 22, 2021 - 17:12

Thanks everyone

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 12, 2021 - 21:21

Thank you for your feedback!

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Jun 22, 2021 - 17:12

Fantastic meeting... thank you very much for the update and the information! looking forward to future updates and best of luck!

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Oct 12, 2021 - 21:20

Thank you for your feedback!

  • Vote for this question0
  • Downvote this question0