Scarborough Subway Extension

Scarborough Subway Extension - Alignment and Design of the System


Stations

Lawrence and McCowan

Map highlighting the Lawrence and McCowan station.

  • Underground station located at Lawrence Avenue, west of McCowan Road.
  • The station will be built during the stations, rail and systems contract. Station design will be part of future engagements.
decorative icon displaying calendar

Early works and headwall construction are expected to begin in summer 2021 with the start of the advance tunnel contracts.

Scarborough Centre

Map highlighting the Scarborough Centre station.

  • Underground station located east of McCowan Road and north of Bushby Drive.
  • Easy connections to GO and TTC bus service.
  • The station will be built during the stations, rail and systems contract. Station design will be part of future engagements.
decorative icon displaying calendar

Early works and headwall construction are expected to begin in summer 2021 with the start of the advance tunnel contract.

Sheppard and McCowan

Map highlighting the Sheppard and McCowan station.

  • Underground terminus station located directly east of McCowan Road and north of Sheppard Avenue.
  • The station will be built during the stations, rail and systems contract. Station design will be part of future engagements.
decorative icon displaying calendar

Early works are expected to begin in summer 2021 with the start of the advance tunnel contract.

 

Launch and Extraction Shaft: Sheppard Avenue and Kennedy Station

The Scarborough Subway Extension requires a tunnel mobilization site in the area of the proposed Sheppard Station (north east corner of Sheppard Avenue and McCowan Road).

A tunnel boring machine (TBM) will be assembled and lowered into the ground at the launch shaft. Launch shaft construction is expected to begin in the summer of 2021 and the TBM is expected to launch in spring 2022. The launch site will remain active while tunnelling is completed and as muck is removed and the precast segment tunnel linings are stored before being lowered and installed.

The TBM will be launched from the launch site’s north east corner, travelling south to an extraction shaft located at Midland and Eglinton Avenue.

Map highlighting launch shaft 1 on the north east corner of Sheppard and McCowan.

The extraction shaft is where the boring machine is dismantled and removed from the ground after completing the tunnel.

Image of Eglinton Crosstown LRT tunnel boring machine extraction near Eglinton Ave. and Yonge St.

Eglinton Crosstown LRT tunnel boring machine extraction near Eglinton Ave. and Yonge St.