This graphic maps out the three work zones in Mississauga South

Mississauga South is divided in to three work zones:

  • Work Zone 1 – Park Street to Inglewood Drive
  • Work Zone 2 – Inglewood Drive to South Service Road
  • Work Zone 3 – QEW North ramp to Harborn Road

A look at where we are now and where we are going!

A side by side image taken from south of Inglewood Drive in spring 2021 and a rendering showing how it will look upon project completion

Six-Month Construction Lookahead

Over the next six months residents and businesses in Mississauga South will see temporary traffic signals, and bus platforms followed by work to extend Eagelwood Boulevard to Oriole Avenue. Utility relocations will start at Park street and move north

 

Crews continue work in the north parking lot at Port Credit GO to revitalize Mary Fix Creek, removing the existing concrete channel and installing a temporary pedestrian bridge prior to removal of the west bridge. In the south lot, structural supports are being installed ahead of work to create the outer walls of the LRT station under the Lakeshore West rail tracks and CN Bridge.

Temporary Bus Stop Platforms

During construction, bus stops will remain safe and accessible using temporary boarding platforms. Signs directing passengers to their stop, along with bus stop markers, will be installed. Impacted will be MiWay Bus Routes 2, 8, and 335.

The public will be notified in advance about these changes through:

The table below outlines the temporary platforms expected when utility works begin this summer.

MiWay Bus Stop No.Intersection

MiWay 324

Inglewood and Hurontario

MiWay 334

Mineola and Hurontario

MiWay 304

Hurontario and North of Mineola

MiWay 332

Pinewood Trail and Hurontario

MiWay 330

Hampshire and Hurontario