> GO Rail Network Electrification EPR Addendum | Metrolinx Engage

GO Rail Network Electrification EPR Addendum

The Environmental Project Report (EPR) Addendum has been completed for the GO Rail Network Electrification TPAP, in accordance with Ontario Regulation 231/08. The environmental impact of the GO Rail Network Electrification transit project was assesssed and an Environmental Project Report (EPR) Addendum was prepared in accordance with the Transit Project Assessment Process (TPAP) as prescribed in Ontario Regulation 231/08 - Transit Projects and Metrolinx Undertakings (made under the Environmental Assessment Act).

The Environmental Project Report Addendum for the GO Rail Network Electrification Addendum was available for public review from  February 23 to March 24, 2021. It has been reviewed by the Minister of the Environment, Conservation and Parks. As of June 2021, the Final Environmental Project Report and Appendices are now available. The project can now proceed to the detailed design and implementation phase.

 

GO Rail Network Electrification: Errata to Environmental Project Report Addendum

GO Rail Network Electrification Environmental Project Report Addendum Executive Summary

GO Rail Network Electrification Environmental Project Report Addendum

Appendix A: Natural Environment Impact Assessment Report

Appendix B: Preliminary Environmental Site Assessment (ESA) Technical Memorandum (prepared for New Track & Facilities TPAP Layover and Storage Facilities)

Appendix C: Cultural Heritage Technical Memorandum

Appendix C1: Cultural Heritage Technical Memorandum

Appendix C2: Cultural Heritage Report: Existing Conditions and Preliminary Impact Assessment Union Station Rail Corridor (USRC) Hydro One Conflict Areas

Appendix C3: Heritage Impact Assessment: Lower Sherbourne Street USRC Bridge

Appendix C4: Heritage Impact Assessment: Parliament Street USRC Bridge

Appendix C5: Heritage Impact Assessment: Cherry Street USRC Bridge

Appendix D: Archaeological Assessment Report (Prepared for New Track & Facilities TPAP)

Appendix E: Land Use and Socio-Economic Impact Assessment Report

Appendix F: Air Quality Assessment Reports

Appendix F1: Regional Air Quality Study Report

Appendix F2: USRC Air Quality Study Report

Appendix F3: Kitchener Air Quality Study Report

Appendix F4: Lakeshore East Air Quality Study Report

Appendix G -Noise and Vibration Modelling Reports

Appendix G1: USRC Impact Assessment Report

Appendix G2: Lakeshore West Impact Assessment Report

Appendix G3: Kitchener Impact Assessment Report

Appendix G4: Barrie Impact Assessment Report

Appendix G5: Stouffville Impact Assessment Report

Appendix G6: Lakeshore East Impact Assessment Report

Appendix H: Visual Impact Assessment Report (Prepared for New Track & Facilities TPAP)

Appendix I: Utilities Impact Assessment Report (Prepared for New Track & Facilities TPAP Layover and Storage Facilities)

Appendix I: Utilities Impact Assessment Report Part 1 of 2(Prepared for New Track & Facilities TPAP Layover and Storage Facilities)

Appendix I: Utilities Impact Assessment Report  Part 2 of 2(Prepared for New Track & Facilities TPAP Layover and Storage Facilities)

Appendix J: Electromagnetic Interference/Electromagnetic Fields (EMI/EMF) Impact Assessment Report

Appendix K: Preliminary Stormwater Management Reports (Prepared for New Track & Facilities TPAP Layover and Storage Facilities)

Appendix L: Hydrogeological Impact Assessment Study (Prepared for New Track & Facilities TPAP)

Appendix L: Hydrogeological Impact Assessment Study - Part 1 of 4

Appendix L: Hydrogeological Impact Assessment Study - Part 2 of 4

Appendix L: Hydrogeological Impact Assessment Study - Part 3 of 4

Appendix L: Hydrogeological Impact Assessment Study - Part 4 of 4

Appendix M: Consultation Record.

Appendix M1: Master Contact List

Appendix M2: Public Notices and Newspaper Ads

Appendix M3: Stakeholder Notification and Correspondence

Appendix M4: PIC 1 Summary Report Part 1 of 4

Appendix M4: PIC 1 Summary Report Part 2 of 4

Appendix M4: PIC 1 Summary Report Part 3 of 4

Appendix M4: PIC 1 Summary Report Part 4 of 4

Appendix M5: PIC 2 Summary Report Part 1 of 8 

Appendix M5: PIC 2 Summary Report Part 2 of 8

Appendix M5: PIC 2 Summary Report Part 3 of 8

Appendix M5: PIC 2 Summary Report Part 4 of 8

Appendix M5: PIC 2 Summary Report Part 5 of 8

Appendix M5: PIC 2 Summary Report Part 6 of 8

Appendix M5: PIC 2 Summary Report Part 7 of 8

Appendix M5: PIC 2 Summary Report Part 8 of 8

Appendix M6: PIC 3 Summary Report Part 1 of 2

Appendix M6: PIC 3 Summary Report Part 2 of 2

Appendix M7: Public Correspondence

Appendix M8: Indigenous Correspondence Part 1 of 2

Appendix M8: Indigenous Correspondence Part 2 of 2

Appendix M9: Municipal Correspondence Part 1 of 8

Appendix M9: Municipal Correspondence Part 2 of 8

Appendix M9: Municipal Correspondence Part 3 of 8

Appendix M9: Municipal Correspondence Part 4 of 8

Appendix M9: Municipal Correspondence Part 5 of 8

Appendix M9: Municipal Correspondence Part 6 of 8

Appendix M9: Municipal Correspondence Part 7 of 8

Appendix M9: Municipal Correspondence Part 8 of 8

Appendix M10: Agency Correspondence Part 1 of 4

Appendix M10: Agency Correspondence Part 2 of 4

Appendix M10: Agency Correspondence Part 3 of 4

Appendix M10: Agency Correspondence Part 4 of 4

Appendix M11: Other Stakeholder Correspondence Part 1 of 4

Appendix M11: Other Stakeholder Correspondence Part 2 of 4

Appendix M11: Other Stakeholder Correspondence Part 3 of 4

Appendix M11: Other Stakeholder Correspondence Part 4 of 4

Appendix M12: Don Fleet Junction Update

Appendix N: Conceptual Electrification Corridor Plans (Revised OCS Impact Zone and Vegetation/Tree Removal Zones)

Appendix N1: Union Station Rail Corridor

Appendix N2: Lakeshore West

Appendix N3: Kitchener

Appendix N4: Barrie

Appendix N5: Stouffville

Appendix N6: Lakeshore East

Appendix O: Mapping of Noise/Vibration Receptors and Recommended Locations for Noise/Vibration Mitigation

Appendix O1: Union Station Rail Corridor

Appendix O2: Lakeshore West

Appendix O3: Kitchener

Appendix O4: Barrie Part 1 of 2

Appendix O4: Barrie Part 2 of 2

Appendix O5: Stouffville

Appendix O6: Lakeshore East

Appendix P: List of Technical Reports and Studies Reviewed*

*Please note that appendices included in Appendix P are labelled per the New Track & Facilities EPR and Scarborough Junction Grade Separation EPR

For more information on process, please visit the following Government of Ontario webpages: