GO Rail Network Electrification EPR Addendum

The Environmental Project Report (EPR) has been prepared for the GO Rail Network Electrification Addendum, in accordance with the Transit Project Assessment Process (TPAP) as prescribed in Ontario Regulation 231/08 - Transit Projects and Metrolinx Undertakings (made under the Environmental Assessment Act). The EPR Addendum for the GO Rail Network Electrification project is available for a 30-day public review period starting  February 23 to March 24, 2021 .

Please review the EPR and associated technical reports below. Interested persons are encouraged to review the document(s) and provide comments by March 24, 2021 to:

Metrolinx
10 Bay Street
Toronto, Ontario
M5J 2R8

Tel: 416-202-0888

Or the email address relevant to your area: [email protected] (East of Union Station);

[email protected] (West of Union Station); [email protected];

[email protected]; [email protected]; [email protected];

or [email protected].

C/O Mirjana Osojnicki 

Manager, Environmental Programs and Assessment, Pre-Construction Services

 

The following provides a brief overview of the contents found within each section of the EPR Addendum and supporting technical reports (included as Appendices).

Section 1 – describes the study background, purpose, rationale for the changes, and regulatory context.

Section 2 – provides the updated project description and overview of the study area (including map).

Section 3 – provides a description of the updated baseline (existing) environmental conditions within the study area.

Section 4 – describes the updated assessment of potential environmental impacts, including updated noise, vibration and air quality impacts, as well as recommended mitigation and monitoring measures associated with implementation of the Project.

Section 5 – describes the consultation process and activities that were undertaken as part of the GO Rail Network Electrification EPR Addendum. This section also provides an overview of the input/comments/feedback received from various stakeholders and how they were considered by Metrolinx (i.e., Review Agencies, Indigenous Communities and Nations, the Public, Property Owners, etc.).

Section 6 – describes the proposed additional and/or updated commitments to future work, and outlines the additional anticipated approvals and permits required for implementing the Project.

 

GO Rail Network Electrification Environmental Project Report Addendum Executive Summary

GO Rail Network Electrification Environmental Project Report Addendum

Appendix A: Natural Environment Impact Assessment Report

Appendix B: Preliminary Environmental Site Assessment (ESA) Technical Memorandum (prepared for New Track & Facilities TPAP Layover and Storage Facilities)

Appendix C: Cultural Heritage Technical Memorandum

Appendix C1: Cultural Heritage Technical Memorandum

Appendix C2: Cultural Heritage Report: Existing Conditions and Preliminary Impact Assessment Union Station Rail Corridor (USRC) Hydro One Conflict Areas

Appendix C3: Heritage Impact Assessment: Lower Sherbourne Street USRC Bridge

Appendix C4: Heritage Impact Assessment: Parliament Street USRC Bridge

Appendix C5: Heritage Impact Assessment: Cherry Street USRC Bridge

Appendix D: Archaeological Assessment Report (Prepared for New Track & Facilities TPAP)

Appendix E: Land Use and Socio-Economic Impact Assessment Report

Appendix F: Air Quality Assessment Reports

Appendix F1: Regional Air Quality Study Report

Appendix F2: USRC Air Quality Study Report

Appendix F3: Kitchener Air Quality Study Report

Appendix F4: Lakeshore East Air Quality Study Report

Appendix G -Noise and Vibration Modelling Reports

Appendix G1: USRC Impact Assessment Report

Appendix G2: Lakeshore West Impact Assessment Report

Appendix G3: Kitchener Impact Assessment Report

Appendix G4: Barrie Impact Assessment Report

Appendix G5: Stouffville Impact Assessment Report

Appendix G6: Lakeshore East Impact Assessment Report

Appendix H: Visual Impact Assessment Report (Prepared for New Track & Facilities TPAP)

Appendix I: Utilities Impact Assessment Report (Prepared for New Track & Facilities TPAP Layover and Storage Facilities)

Appendix I: Utilities Impact Assessment Report Part 1 of 2(Prepared for New Track & Facilities TPAP Layover and Storage Facilities)

Appendix I: Utilities Impact Assessment Report  Part 2 of 2(Prepared for New Track & Facilities TPAP Layover and Storage Facilities)

Appendix J: Electromagnetic Interference/Electromagnetic Fields (EMI/EMF) Impact Assessment Report

Appendix K: Preliminary Stormwater Management Reports (Prepared for New Track & Facilities TPAP Layover and Storage Facilities)

Appendix L: Hydrogeological Impact Assessment Study (Prepared for New Track & Facilities TPAP)

Appendix L: Hydrogeological Impact Assessment Study - Part 1 of 4

Appendix L: Hydrogeological Impact Assessment Study - Part 2 of 4

Appendix L: Hydrogeological Impact Assessment Study - Part 3 of 4

Appendix L: Hydrogeological Impact Assessment Study - Part 4 of 4

Appendix M: Consultation Record.

Appendix M1: Master Contact List

Appendix M2: Public Notices and Newspaper Ads

Appendix M3: Stakeholder Notification and Correspondence

Appendix M4: PIC 1 Summary Report Part 1 of 4

Appendix M4: PIC 1 Summary Report Part 2 of 4

Appendix M4: PIC 1 Summary Report Part 3 of 4

Appendix M4: PIC 1 Summary Report Part 4 of 4

Appendix M5: PIC 2 Summary Report Part 1 of 8 

Appendix M5: PIC 2 Summary Report Part 2 of 8

Appendix M5: PIC 2 Summary Report Part 3 of 8

Appendix M5: PIC 2 Summary Report Part 4 of 8

Appendix M5: PIC 2 Summary Report Part 5 of 8

Appendix M5: PIC 2 Summary Report Part 6 of 8

Appendix M5: PIC 2 Summary Report Part 7 of 8

Appendix M5: PIC 2 Summary Report Part 8 of 8

Appendix M6: PIC 3 Summary Report Part 1 of 2

Appendix M6: PIC 3 Summary Report Part 2 of 2

Appendix M7: Public Correspondence

Appendix M8: Indigenous Correspondence Part 1 of 2

Appendix M8: Indigenous Correspondence Part 2 of 2

Appendix M9: Municipal Correspondence Part 1 of 8

Appendix M9: Municipal Correspondence Part 2 of 8

Appendix M9: Municipal Correspondence Part 3 of 8

Appendix M9: Municipal Correspondence Part 4 of 8

Appendix M9: Municipal Correspondence Part 5 of 8

Appendix M9: Municipal Correspondence Part 6 of 8

Appendix M9: Municipal Correspondence Part 7 of 8

Appendix M9: Municipal Correspondence Part 8 of 8

Appendix M10: Agency Correspondence Part 1 of 4

Appendix M10: Agency Correspondence Part 2 of 4

Appendix M10: Agency Correspondence Part 3 of 4

Appendix M10: Agency Correspondence Part 4 of 4

Appendix M11: Other Stakeholder Correspondence Part 1 of 4

Appendix M11: Other Stakeholder Correspondence Part 2 of 4

Appendix M11: Other Stakeholder Correspondence Part 3 of 4

Appendix M11: Other Stakeholder Correspondence Part 4 of 4

Appendix M12: Don Fleet Junction Update

Appendix N: Conceptual Electrification Corridor Plans (Revised OCS Impact Zone and Vegetation/Tree Removal Zones)

Appendix N1: Union Station Rail Corridor

Appendix N2: Lakeshore West

Appendix N3: Kitchener

Appendix N4: Barrie

Appendix N5: Stouffville

Appendix N6: Lakeshore East

Appendix O: Mapping of Noise/Vibration Receptors and Recommended Locations for Noise/Vibration Mitigation

Appendix O1: Union Station Rail Corridor

Appendix O2: Lakeshore West

Appendix O3: Kitchener

Appendix O4: Barrie Part 1 of 2

Appendix O4: Barrie Part 2 of 2

Appendix O5: Stouffville

Appendix O6: Lakeshore East

Appendix P: List of Technical Reports and Studies Reviewed*

 

*Please note that appendices included in Appendix P are labelled per the New Track & Facilities EPR and Scarborough Junction Grade Separation EPR

There are circumstances where the Minister of the Environment, Conservation and Parks has the authority to require further consideration of the transit project or impose conditions on it. These include if the Minister is of the opinion that:

  • The transit project may have a negative impact on a matter of provincial importance that relates to the natural environment or has cultural heritage value or interest; or
  • The transit project may have a negative impact on a constitutionally protected Aboriginal or treaty right.

Before exercising the authority referred to above, the Minister is required to consider any written objections to the transit project that he or she may receive within 30 days of first publishing the Notice of Addendum. If you have discussed your issues with Metrolinx and you object to the project, you can provide a written submission to the Minister of the Environment, Conservation and Parks by no later than March 24, 2021 to the email provided below. All submissions must clearly indicate that an objection is being submitted and describe any negative impacts to matters of provincial importance (natural/cultural environment) or Aboriginal rights.

Ministry of the Environment, Conservation and Parks

Environmental Assessment Branch

Attn: Devon Wills, Project Officer

Tel: 416-270-4457 / toll-free: 1-800-461-6290

[email protected]

For more information on process, please visit the following Government of Ontario webpages:

Comments and information regarding this project are being collected to assist in meeting the requirements of the Environmental Assessment Act. All personal information included in a submission – such as name, address, telephone number and property location – is collected, maintained and disclosed by the Ministry of the Environment, Conservation and Parks for the purpose of transparency and consultation. The information is collected under the authority of the Environmental Assessment Act or is collected and maintained for the purpose of creating a record that is available to the general public as described in s. 37 of the Freedom of Information and Protection of Privacy Act. Personal information you submit will become part of a public record that is available to the general public unless you request that your personal information remain confidential. For more information, please contact the Senior Privacy Officer for Metrolinx at 416-202-5941.

View the Notice of Environmental Project Report Addendum.