
Public meetings are being held at various locations across the GO Rail network to provide an update on the GO Rail Network Electrification Project. The purpose of these meetings is to:
- Provide update on Electrification;
- Present updated Traction Power Facility sites;
- Describe potential impacts and mitigation measures;
- Begin the dialogue and seek feedback on the need for required vegetation/tree removal and potential mitigation options; and,
- Seek your comments and input.
Learn about the topics discussed
Review the presentations and information sheets distributed to participants at the Open House.
Presentation
- GO Electrification Transit Project Assessment Process (19.5 MB PDF)
EA Info Sheets
- Trees (880 KB PDF)
- Noise (1.43 MB PDF)
- Vibration (576 KB PDF)
- Visual Impacts (460 KB PDF)
Roll Plans
- Barrie (32.45 MB PDF)
- Kitchener (16.9 MB PDF)
- Lakeshore East (28.2 MB PDF)
- Lakeshore West (15.2 MB PDF)
- Stouffville (24.8 MB PDF)
- Union Station Rail Corridor (1.2 MB PDF)
Tell us what you think
Help us shape the future of transportation in your community. Comments will be accepted until December 14, 2016.