Eglinton Crosstown LRT Project Virtual Open House - Central West - Cedarvale to Eglinton

Metrolinx and Crosslinx open houses are an opportunity to get project updates, to learn more about a specific topic of interest to you, and to ask general questions.

As we have shifted to virtual open houses, you can find below a project update presentation deck of this Spring’s Central - West Cedarvale to Eglinton open house. 

You can also download the presentation PDF below. 

Note: There is no real-time engagement during the open house. We will work to ensure questions are answered with 3-5 business days.


 

image of presentation pdf panel

 

Submit your questions about the presentation below. Question submission will close on April 28, 2021.

Questions not related to this presentation? Please Contact Us.

NOTE: Conduct inconsistent with our policies will result in the removal of your submission.

Comment Sort

  • Sort questions:
  • Date
  • Popularity

Comments

Daniel's avatar
Apr 23, 2021 - 13:25

Why is Eglinton station still going to be called "Eglinton"? In Toronto, intersection stations have the following naming style: "Bloor-Yonge" or "Sheppard-Yonge". In the case of Bloor-Yonge station, the Line 1 platform is called "Bloor" and the Line 2 platform is called "Yonge", because people already what street they are currently on and they need to know the name of the opposing street.

It makes no sense to keep the name of this station. It should be called "Eglinton-Yonge". I know that the naming process has closed, but it's not too late! Isn't so obvious that "Eglinton-Yonge" is the only logical name for this very important station? It's not too late, and I hope Metrolinx could still reconsider this issue.

  • Vote for this question3
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Apr 30, 2021 - 10:13

Naming principles were established and applied consistently across the regional transit network. Public input was sought for proposed names. Metrolinx’s Design Excellence team completed a study on regional transit wayfinding harmonization including station, stop, and interchange naming. As part of this, a set of principles was established for selecting names which, applied consistently across the regional transit network, will help to make transit easier to navigate and avoid customer confusion. You can learn more online https://metrolinxengage.com/en/content/eglinton-crosstown-line-station-and-stop-names

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Apr 27, 2021 - 00:14

Why hasn't the metrostincks CEO been fired for this mess of a project? Overtime and over budget - and he still got his 2020 pay raise! Chances are this line won't open in 2022 due to metrolinx incompetence.

  • Vote for this question2
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Apr 30, 2021 - 10:16

Unfortunately, Crosslinx Transit Solutions (CTS) has faced a number of challenges since the start of the project, including starting nine months later than planned after contract award in July 2015,  CTS was slow to finalize the designs with some design work packages, and although CTS has significantly improved its production rate since the 2018 agreement, it has achieved only 84 per cent of its target, meaning the project will be delayed. In addition, an unpredictable, but safe, defect was found under the TTC station box at Eglinton-Yonge station. Metrolinx, Infrastructure Ontario, CTS, and the TTC have been seized with addressing this defect and although a way forward has been determined, the station will be delayed further. It is important to note that the project remains within budget. We will keep the public apprised on a consistent basis over the next year on how work is progressing. 

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Apr 22, 2021 - 21:30

until the escalators and elevators are delivered for Cedarvale station, aren't you going to work on the stairwells

  • Vote for this question1
  • Downvote this question1
Metrolinx's avatar

Metrolinx
Apr 30, 2021 - 10:50

Stair construction is ongoing at Cedervale station.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

There haven't been any specific timelines for when detailed design and construction will happen.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar
Apr 23, 2021 - 18:24

I'll ask you again: if the maps are inside the LRV's, will they be similar to Toronto Rocket, or Montreal's future REM?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Apr 30, 2021 - 10:49

Designs are still in the process of being finalized; details will be shared once they have been confirmed.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar
Apr 23, 2021 - 19:27

In the future, Exactly how many elevators will it take to go down from the lrt entrance to the lrt platform ?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
May 13, 2021 - 22:12

It will take 2 elevators: one from the main entrance down to the upper concourse and the second from the concourse to the LRT platform.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar
Apr 23, 2021 - 19:35

did you complete the platform slabs in all the stations in this segment?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
May 13, 2021 - 22:13

Not all the platform slabs are complete in this segment.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Apr 23, 2021 - 20:02

Did you finish installing escalators at Avenue station

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Apr 30, 2021 - 10:22

Escalator installations are complete within the Station Box. Escalators will be installed the Main Entrance through this year.

  • Vote for this question0
  • Downvote this question0
darkcondor78's avatar

darkcondor78
Apr 23, 2021 - 21:45

When will Forest Hill station getting escalators for the underground platform level and when the two entrances be done?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Apr 30, 2021 - 17:04

The escalator delivery is dependent on the readiness of the station box to accept the equipment. The structural elements (shell space) for the entrances are scheduled to be completed by the end of this year.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar
Apr 23, 2021 - 22:39

when are you going install the elevators and deliver the escalators to each station in this segment.

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Apr 30, 2021 - 10:53

Elevator and escalator deliveries and installations are ongoing throughout 2021 throguhout the various stations.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Apr 23, 2021 - 22:46

I don't understand. Why are you not building the staircases on this segment with the exception of Chaplin station?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
May 13, 2021 - 22:15

Stairs are being built at multiple entrances throughout this segment.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Apr 24, 2021 - 09:28

Will Forest Hill station's second exit/entrance have any ESCALATORS

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Apr 30, 2021 - 17:05

No, the only mandatory AODA compliant entrance is the main entrance.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Apr 24, 2021 - 11:34

Will Chaplin station contains upper and lower concourse levels ?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Apr 30, 2021 - 10:44

At Chaplin's station box, there is only one level of concourse. At the entrances there is service level (upper concourse level) and then the concourse level.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Apr 24, 2021 - 19:43

Is Avenue station's second exit/entrance accessible or not

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Apr 30, 2021 - 10:22

The Main Entrance is accessible and will have escalators and elevator. The Secondary Entrance will have stairs leading from the street level to the station box.  

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Your renderings and design didn't show that.

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Apr 30, 2021 - 10:55

Yes, Avenue station will have both a service concourse and a lower concourse level.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Apr 24, 2021 - 19:55

In this 'Central-West' segment, which stations involve concrete pours

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
May 13, 2021 - 22:17

Most stations in this segment require concrete pours with the exception of Fairbank Station currently.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar
Apr 24, 2021 - 19:58

will traffic lanes of Eglinton Av. be reduced in both directions or one

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Apr 30, 2021 - 10:57

Eglinton Ave W currently is reduced to one lane in each direction between Lascelles Blvd and Duplex Ave.The current traffic configuration will remain in place through September 2021

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Apr 24, 2021 - 20:03

how many floors will Forest Hill station have? 4 or 3?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Apr 30, 2021 - 17:02

Forest Hill will have ground floor, upper and lower concourses and the platform level.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Apr 24, 2021 - 22:31

I don't understand. Why is it that the intersection of Bathurst and Eglinton gets a left turn during construction and the other intersections don't?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Apr 30, 2021 - 17:01

When the traffic turning radius allows undisturbed vehicle flow the intersection turns can be introduced. It varies from station to station's intersection geometry and condition.  

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar
Apr 24, 2021 - 22:41

Are all the LRV's delivered?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Apr 30, 2021 - 10:58

No, not all the LRVs have been delivered.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Apr 24, 2021 - 22:56

Although you delivered the escalators for Avenue station, what you gonna do 'bout the elevators?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Apr 30, 2021 - 10:24

Elevator delivery and installation will take place throughout 2021.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Apr 24, 2021 - 23:18

with coupling, will the Eglinton Crosstown contain 3-vehicle trains or 2-vehicle trains ? (NOTE: 2-vehicle trains are similar to the O-train Confederation line in Ottawa.)

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Apr 30, 2021 - 17:09

the Crosstown LRV will be 2 - vehicle trains.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Apr 24, 2021 - 23:31

Can you create tunnels that are like the tunnels in which surround 'St-Laurent O-Train station' in Ottawa

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Apr 30, 2021 - 11:04

Those tunnels are not within the Eglinton Crosstown LRT project scope.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Apr 26, 2021 - 11:34

Will Chaplin station's third exit/entrance have any escalators?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Apr 30, 2021 - 10:40

Chaplin Station's third entrance will not have escalators.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Apr 26, 2021 - 11:35

Will Avenue station's second exit/entrance have any escalators ?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Apr 30, 2021 - 10:25

No, Avenue station's second entrance will not have escalators.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Apr 27, 2021 - 14:22

As shown in your design, exactly how underground stations will have cafes besides their main entrance? I found out that all of not them will.

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
May 13, 2021 - 22:20

Retail is to be included at Mount Dennis, Caledonia, Fairbank, Forest Hill, Avenue, Mount Pleasant, Leaside, Laird, Science Centre and Kennedy.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar
Apr 27, 2021 - 14:28

Just to make sure you're right, are really REALLY SURE and telling the truth that TTC Eglinton West station on Line 1 will be renamed to Cedvarvale with the lrt station?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Apr 30, 2021 - 11:08

Yes, the TTC will be renaming Eglinton West to Cedarvale in time for the Crosstown opening.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Apr 27, 2021 - 17:59

did you complete the plaza at Cedarvale station ?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
May 13, 2021 - 22:21

Not as of yet. The plaza will be completed during the final road restoration and landscaping works.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Apr 27, 2021 - 18:03

when will you start building Cedarvale station's main and secondary entrances' sturcture

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
May 13, 2021 - 22:23

Secondary Entrance construction is underway above street level. Above ground construction of the main entrance will begin in approximately Sumer 2021.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Apr 27, 2021 - 18:24

You did start building Forest Hill station's secondary entrance structure, what are you going to do about the main entrance? Aren't you going to build its structure?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Apr 30, 2021 - 10:27

Yes, work on the main entraince will continue throughout 2021.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

1. If you completed the concourse at Fairbank station, why are you not restoring the road?

2. will the new passenger pick-up and drop-off building at Mount Dennis station be accessible as shown in the video?

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
May 13, 2021 - 22:26

Road restoration will start to happen in Summer 2021 at Fairbank Station.
Yes, the pick-up and drop-off area at Mount Dennis station will be accessible.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar
  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Apr 30, 2021 - 10:28

We have reported this problem to our IT team. Thank you for bringing this to our attention.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar
  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
May 13, 2021 - 22:27

The main entrance on Parkhill will have an elevator and an escalator. The secondary entrance west of Allen Road north will have an elevator (no escalator), the third entrance (on Everden Rd) will have a staircase only. TTC’s Eglinton West entrance will continue to have an elevator and an escalator.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Apr 28, 2021 - 13:31

even though you can build cut-and-cover stations can you build cut-and-cover tunnels? I bet it can be useful in a tunnel segment but in this phrase

perhaps cut-and-cover tunnels can used in the Eglinton Crosstown's extensions.

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Apr 30, 2021 - 17:11

We have looked at two types of construction methods for the Eglinton Crosstown West Extension: cut-and-cover and tunnel boring. Tunnel boring has fewer surface impacts and we can design it to avoid major impacts to underground utilities, which in turn reduces local impacts even further. We are proceeding with the twin-bore method to construct the tunnel alignment from Renforth to west of Scarlett.

Along with the stations and elevated guideway, the tunneled section east of Jane and into Mt. Dennis is a part of the Stations, Rail and Systems contract beginning in approximately 2025. As we are in the early stages of design for these elements, we are still determining the construction approach for this tunneled section. For the future stations, we are currently considering a cut-and-cover construction approach. As the design advances and we have more details to share, we will come back to the community for feedback and input.

  • Vote for this question0
  • Downvote this question0
Anonymous's avatar

Anonymous
Apr 28, 2021 - 13:39

Are you sure that the Eglinton crosstown LRV's will be fast as Ottawa's light rail Confederation line?

If only I asked earlier

  • Vote for this question0
  • Downvote this question0
Metrolinx's avatar

Metrolinx
Apr 30, 2021 - 10:30

The LRVs will be operated by TTC at speed limits permitted by the City of Toronto.

  • Vote for this question0
  • Downvote this question0