Durham-Scarborough BRT
- Studies
Environmental Project Report (EPR) update
The Environmental Project Report (EPR) was available for review for a 30-day review period from January 21, 2022 to February 22, 2022. On March 28, 2022, the Minister of the Environment, Conservation and Parks issued a Notice to Proceed with the transit project in accordance with Ontario Regulation 231/08. As the final step of the Transit Project Assessment Process (TPAP), Metrolinx and Durham Region have issued a Statement of Completion in accordance with Ontario Regulation 231/08.
To enlarge above graphic, please click here.
TPAP timeline
Previous Studies
2022 - 30% Preliminary Design (TPAP -approved)
- Preliminary Design - Toronto
- Preliminary Design - Pickering
- Preliminary Design - Ajax
- Preliminary Design - Whitby
- Preliminary Design - Oshawa
2022 - Draft 30% Preliminary Design
- Draft Preliminary Design – Toronto
- Draft Preliminary Design – Pickering
- Draft Preliminary Design – Ajax
- Draft Preliminary Design – Whitby
- Draft Preliminary Design – Oshawa