DSBRT - PIC 3 - Stormwater and Structures

Major culverts and bridges along the BRT corridor have been identified and reviewed to understand the existing hydraulic and structural conditions. 

There are 32 crossings along the corridor, including: 28 watercourse or drainage ditch crossings, and 4 other crossings of railways and highways.

Crossings Map

An orthophoto map of the study area, highlighting culverts and structures (including creeks and rivers). A line illustrates the proposed BRT route, and indicates all water crossings and road crossings.
Click to enlarge

Modification is recommended at multiple locations. Potential modifications include replacement, rehabilitation, extension or widening to: meet current hydraulic standards, strengthen older structures, and accommodate the addition of bus lanes.