> Davenport Diamond - Kitchener Fourth Track Installation | Metrolinx Engage

Davenport Diamond

Davenport Diamond - Kitchener Fourth Track Installation

In 2018, Metrolinx completed the installation of a fourth track from Nickle Street to Black Creek Drive. The addition of a fourth track allows all day service in two directions from Toronto to Brampton.

The installation of the fourth track between Lansdowne Avenue and Black Creek Drive is expected to go to tender in late 2021.  Work includes a new access pavilion and pedestrian tunnel from the West Toronto Rail Path and Dundas West TTC Station that connects with the existing tunnels at Bloor GO Station.

Live Meetings & Virtual Open Houses